In August 2015, Parker Smith opened Guitar Shed in a single room in Kirkwood with four students. Eleven years later the music school teaches guitar, piano, voice, drums, violin and more to kids and adults, and it has now bought a building of its own. Urbanize Atlanta reported on Nov. 17 that Guitar Shed had closed on the former church at 1689 Hosea L. Williams Drive SE the week before. Smith declined to disclose the purchase price.
Owning rather than leasing changes what Guitar Shed is on this stretch of Hosea. Today it leases space at the Kirkwood Park commercial node. Next summer it plans to move into the building it now owns about two blocks away, where the separate building behind the church will give the school a small performance room of its own. For anyone in Kirkwood with a kid in a teen band or a Tuesday-night guitar lesson, the move is short and the gain is real.
Two Blocks East, Same Corridor
Guitar Shed's current address is 1610 Hosea L. Williams Dr., Suites A, B and E, where Kirkwood meets Edgewood along the Trolley Line Trail. Longtime neighbors may remember the space as home to Spotted Trotter and other businesses before the music school moved in.
The new property is the former home of St. Mark Church's Simply Blessed Workhouse of Faith. The church complex closed four years ago, and it sits just west of downtown Kirkwood. According to Urbanize, LoopNet lists the church building as dating to 1973.
The purchase took years. Smith told Urbanize the school had been watching the property for about seven years before it went under contract in 2025. He also said why the location mattered, in an email quoted by Urbanize Atlanta: "It's less than a quarter mile from where we are now, so we get to stay in the neighborhood that's supported us from the beginning."
Neighbors weighed in before the deal closed. Decaturish reported that at its virtual monthly meeting on April 10, the Kirkwood Neighbors Organization supported a special use permit for Guitar Shed to move into and renovate the church. At that meeting, Smith said the plan was to change the interior and keep the exterior as it is. "We are looking to move all of our operations there," he said. The same meeting approved a letter to the Atlanta Department of Transportation asking for faded crosswalks to be restriped and heard an update on the artists painting the utility box at Hosea Williams Drive and Howard Street.
The Parsonage Becomes the Drum Building
Because the exterior is staying, the church will look much the same from Hosea. The changes are inside and around the building. Smith told Urbanize the buildings have a combined 4,200 square feet of conditioned space, including an airy main sanctuary. That is roughly 1,000 square feet more than the school has now.
Most lessons will be in the main church. The former parsonage behind it will become two drum rooms, and one of them will double as a small performance space. Putting drums in their own building fits the program, since anyone who has waited in a music school lobby during a drum lesson knows how far the sound carries. Smith named that building as one of the property's draws, along with the parking. "There's also a good amount of parking and a separate building in the back that's perfect for drum lessons," he told Urbanize Atlanta. "The buildings have good bones, and we're excited to have mostly everything under one roof."
The main building's renovation is being handled by Stryant Construction, a Kirkwood-based firm. The scope covers a reception and waiting area, restrooms, a staff break room, parking lot upgrades and an accessible entrance ramp. For a parent dropping off a nine-year-old for piano, a waiting area and a real parking lot are the changes they'll notice first.
Kirkwood residents know the Stryant name from more than this job. The company is behind several changes in the neighborhood's commercial core, which we wrote about when the Kirkwood Wine Stroll set up on a Stryant lot this fall. One of those projects is at 1976 Hosea L. Williams Drive. Urbanize reported in April that the proposal there called for two restaurants, office space and 50 apartments of roughly 340 square feet, and that the city was reviewing demolition and land development permits at that time. Guitar Shed's project is smaller and moving faster. It is a single business renovating a building it owns a few blocks west of the village.
Nothing Moves Before Summer
Current students can expect little to change in the near term. Guitar Shed's lease at the Kirkwood Park node runs through July. Smith told Urbanize the school has its building permit and is getting ready to start work, that renovations should take about five months, and that the move is planned for next summer. If construction starts soon after the new year, the five-month schedule would leave some room before the lease ends in July. Construction schedules often slip, as we noted in our look at what actually finished in Kirkwood this year, so families planning summer lessons should check with the school before signing up.
The plan is for the whole school to end up at the church. Smith told Urbanize the goal is to move the entire operation there as a permanent home. Students who walk or bike to lessons along the Trolley Line Trail will add a couple of blocks to the trip.
Who Fills the Rooms
The extra space will be put to use. Guitar Shed's private lessons cover children, teens and adults, in person or online, on guitar, piano, drums, voice, violin, bass, ukulele, banjo, mandolin, and brass and woodwinds.
The group programs need the most room. Teen and tween bands for ages 10 to 17 rehearse weekly and perform regularly. Adult ensembles also rehearse weekly and perform in rock, blues, jazz and R&B, among other styles. Camp Woodshed, the school's camp for ages 8 to 16, combines one-on-one and group instruction. A band rehearsal takes more space than a one-on-one lesson, and a sanctuary with a high ceiling is built for sound.
The school has held student recitals at well-known local venues, including Eddie's Attic and City Winery. With a performance space in the old parsonage, students will also have a room in their own neighborhood for smaller showings. The Urbanize report calls that room small, so the big recitals will likely stay at outside venues.
Smith's music reaches beyond the school. He hosts ATL Songs, a monthly songwriter round and open mic at Buteco Grant Park presented by the Roots of Rhythm Foundation. The AJC profiled him in June 2024 as an Atlanta singer-songwriter and teacher.
Eastside Churches Have Been Finding Second Lives
Guitar Shed is the latest in a series of eastside church conversions. In East Atlanta Village, the former Holy Temple Deliverance Church at 1206 Metropolitan Ave. became ABV Gallery + Agency's gallery, artist studio, event space and shop after a three-year renovation. Urbanize reported its unveiling in October 2024. In Reynoldstown, the former Free Gospel Interdenominational Church at 955/957 Wylie St. was being converted into six rental apartments as of Urbanize's October 2024 update.
The Kirkwood project stays closest to how the building was used before. A church is a gathering place with a big room built for sound, and that suits a music school. Under the plan, the sanctuary at 1689 Hosea L. Williams Drive will hold most of the lessons, and the drum rooms will be in the old parsonage out back.
Guitar Shed's new campus is about a quarter mile down Hosea from its current space, and changes like this one shape everyday life in Kirkwood. If you live near the corridor and want to talk about what the next year of projects on Hosea could mean for your block, reach out to Golley Realty Group. Talk to a Decatur Neighborhood Expert.